← HARICA cases
Bugzilla #2020140 Dedicated Root Transition Root Lifecycle

HARICA: Transition Plan for Existing Dual-Purpose Roots

ASSIGNED HARICA
This summary was auto-generated by AI and revised by me when needed — accuracy improves with each update. Always refer to the official Bugzilla thread as the authoritative source. If you spot an inaccuracy, let me know via the contact form.
AI Summary

This case tracks HARICA’s preliminary transition plan for two HARICA 2015 root CAs: “Hellenic Academic and Research Institutions ECC RootCA 2015” and “Hellenic Academic and Research Institutions RootCA 2015.” The roots are currently included in NSS with both Websites (TLS) and Email (S/MIME) trust bits enabled. HARICA submitted the plan in response to MRSP §7.5.3 (dual-purpose root transition requirement) and MRSP §7.4 / the Root CA Lifecycle Transition Schedule for trust-bit removal and root removal based on key generation date. HARICA reports that since 2021, most TLS and S/MIME issuance has migrated to dedicated 2021 hierarchies, while the 2015 hierarchy remains present for legacy compatibility considerations. The proposed plan sets Websites (TLS) distrust_after_date to April 15, 2027, S/MIME distrust_after_date to April 15, 2028, and complete root removal from NSS to April 15, 2030. The bug is intended to remain open to track implementation steps and any necessary NSS changes.

Model: gpt-5.4-nano Generated: 2026-06-13 21:16 UTC Revised: 2026-06-16 19:18 UTC Confidence: 0.90 1 comment
Chronology
  1. HARICA generated the key pairs for the HARICA 2015 root hierarchy.
  2. The HARICA 2015 roots were added to NSS.
  3. HARICA migrated most TLS and S/MIME issuance to dedicated 2021 hierarchies.
  4. HARICA’s preliminary transition plan for the dual-purpose 2015 roots was submitted in this bug.
Thread Activity
  1. Mozilla representative — Ben Wilson posted HARICA’s preliminary transition plan, including the MRSP triggers and the proposed distrust_after_date and removal dates for the two 2015 roots.
Participants
Mozilla representative
External References
Related Bugzilla IDs Mentioned
Similar Local Cases
#2020150 ASSIGNED Dedicated Root Transition Opened 2026-02-28 Still Open · 70% similar
Telia: Transition Plan for Existing Dual-Purpose Roots
#2032100 ASSIGNED Dedicated Root Transition Opened 2026-04-15 Still Open · 69% similar
SECOM: Transition Plan for Existing Dual-Purpose Roots
#2018158 ASSIGNED Dedicated Root Transition Operational Change Opened 2026-02-20 Still Open · 69% similar
OISTE: Transition Plan for Existing Dual-Purpose Root
#2030950 ASSIGNED Dedicated Root Transition Opened 2026-04-10 Still Open · 69% similar
KIR SA: Transition Plan for Existing Dual-Purpose Roots
#2032053 ASSIGNED Dedicated Root Transition Opened 2026-04-15 Still Open · 68% similar
GlobalSign: Transition Plan for Existing Dual-Purpose Roots
#2017381 ASSIGNED Dedicated Root Transition Opened 2026-02-17 Still Open · 68% similar
TWCA: Transition Plan for Existing Dual-Purpose Roots
#2031303 ASSIGNED Root Lifecycle Opened 2026-04-13 Still Open · 68% similar
FNMT-RCM: Transition Plan for Existing Roots
#2026208 ASSIGNED Dedicated Root Transition Opened 2026-03-25 Still Open · 67% similar
Telekom Security: Transition Plan for Existing Dual-Purpose Roots

We use only essential cookies and local browser storage for preferences and security. See our Privacy Policy for details.

Confirm action