← Disig, a.s. cases
Bugzilla #2032051 Operational Change

DiSig: Transition Plan for Existing Dual-Purpose Roots

ASSIGNED Disig, a.s.
This summary was auto-generated by AI and revised by me when needed — accuracy improves with each update. Always refer to the official Bugzilla thread as the authoritative source. If you spot an inaccuracy, let me know via the contact form.
AI Summary

This case is about DiSig submitting a transition plan related to existing dual-purpose root certificates. The bug was created by Ben Wilson (b**********n@mozilla.com) in the CA Certificate Root Program component. The thread includes an attachment titled “Root_R2_Transition_Plan_Mozilla.pdf,” which is the transition plan document referenced by the bug. No additional discussion, actions taken by Mozilla, or remediation steps are described in the provided thread content. The bug is currently in the ASSIGNED state. No resolution is recorded in the bug metadata provided.

Model: gpt-5.4-nano Generated: 2026-06-13 21:26 UTC Revised: 2026-06-16 18:41 UTC Confidence: 0.86 1 comment
Chronology
  1. DiSig’s transition plan for existing dual-purpose roots was submitted via a Mozilla CA Program bug with an attached transition plan PDF.
Thread Activity
  1. Mozilla representative — Created the bug and attached “Root_R2_Transition_Plan_Mozilla.pdf” as the transition plan document.
Participants
Mozilla representative
External References
Similar Local Cases
#2018158 ASSIGNED Dedicated Root Transition Operational Change Opened 2026-02-20 Still Open · 69% similar
OISTE: Transition Plan for Existing Dual-Purpose Root
#2033033 ASSIGNED Operational Change Opened 2026-04-17 Still Open · 68% similar
Netlock: Transition Plan for Existing Dual-Purpose Root
#2032939 RESOLVED Operational Change Opened 2026-04-17 · Closed 2026-04-27 · 67% similar
NETLOCK: Transition Plan for Mozilla Root Store Policy 7.5 by Deadline
#2032170 ASSIGNED Operational Change Opened 2026-04-15 Still Open · 66% similar
SSL.com: Transition Plan for Existing Dual Purpose Roots
#2031732 ASSIGNED Operational Change Opened 2026-04-14 Still Open · 60% similar
DigiCert: Transition Plan for Existing Dual-Purpose Roots
#2031663 ASSIGNED Operational Change Opened 2026-04-14 Still Open · 60% similar
ACCV: Transition Plan for Existing Root
#2018979 ASSIGNED Remediation Tracking Self Reported Incident Opened 2026-02-24 Still Open · 59% similar
eMudhra: Transition Plan for Existing Dual-Purpose Roots
#2032060 ASSIGNED Dedicated Root Transition Opened 2026-04-15 Still Open · 47% similar
Microsec: Transition Plan for Existing Dual-Purpose Roots

We use only essential cookies and local browser storage for preferences and security. See our Privacy Policy for details.

Confirm action